The Distillery North Paving Project

Infrastructure Project • South Boston, MA

Project Specifications

  • Location: South Boston, MA
  • Project Type: Commercial / Residential Mixed-Use
  • Duration: 6 Weeks
  • Scope: Excavation, Grading, Drainage, Paving, Concrete Flatwork, Curb Installation
  • Equipment Used: Excavators, Skid Steers, Rollers, Triaxles, Plate Compactors, Pavers
New asphalt paving and concrete curbs at The Distillery North
Urban Paving South Boston, MA Mixed-Use Drainage Upgrades Concrete Curbs

Quick Facts

South Boston, MA
6 Week Schedule
3,000+ Sq Ft Asphalt
400 Linear Ft of Curb

Services Provided

Excavation & Site Prep Grading & Drainage Paving & Asphalt Installation Concrete Aprons & Curbs Utility Coordination Traffic Management

Key Achievements

  • Completed on schedule with zero safety incidents
  • Maintained access for active businesses and residents
  • Delivered Boston Public Works compliant surfaces
  • Implemented sustainable material reuse and controls
Planning
Preparation
Execution
Completion
3,000+ Sq Ft Asphalt
400 Linear Ft of Curb
5 Crew Members Daily
6 Week Schedule

Project Overview

This commercial paving project at The Distillery North in South Boston regraded and resurfaced mixed-use access ways that serve both residential lofts and ground-floor businesses. Working in an active urban environment demanded tight coordination with onsite contractors and city inspectors while we maintained uninterrupted access for the property's tenants.

Custom Drainage Plan

Implemented engineered grading with laser-guided elevations to manage urban runoff and eliminate ponding across the courtyard.

Urban Jobsite Efficiency

Phased work areas, night shifts, and compact equipment usage kept the site accessible despite tight laydown space and steady neighborhood traffic.

Sustainable Execution

Reused recycled asphalt millings on site and enforced dust and runoff controls to meet environmental compliance goals.

Engineering & Design

Partnering with the project engineers, our team executed a custom drainage design that handles stormwater efficiently. Precision grading established the proper pitch for long-term surface durability and minimized freeze-thaw impacts common to New England winters.

Safety Excellence

Daily job hazard analyses, morning briefings, and coordination with Boston safety inspectors ensured zero incidents across the six-week build. Traffic management plans kept pedestrians, cyclists, and delivery vehicles moving safely around the work zone.

Environmental Protection

We implemented strict measures to prevent dust, debris, and runoff from entering nearby storm drains. Material reuse, controlled trucking schedules, and vigilant housekeeping minimized the project's environmental footprint.

Challenges & Solutions

The project presented logistical and environmental challenges including limited laydown areas, high neighborhood traffic, and concurrent trades. We responded with phased scheduling, compact equipment selection, and close collaboration with utility partners to keep work moving without disrupting the vibrant mixed-use community.

Key Solutions

  • Coordinated phased work windows to minimize disruptions for residents and businesses
  • Utilized compact crews and equipment to navigate tight urban access points
  • Maintained night shift operations for critical paving and curing milestones
  • Leveraged experienced NESP paving specialists to meet strict deadlines

Results

The Distillery North paving project finished on time, on budget, and in full compliance with city standards. The refreshed asphalt surfaces and crisp concrete curbs now provide a durable, accessible finish that elevates curb appeal for one of South Boston's most vibrant mixed-use developments.