Alfalfa Farms Brewery Build

Infrastructure Project • Topsfield, MA

Project Specifications

  • Location: Topsfield, MA
  • Project Type: Commercial Brewery Infrastructure
  • Duration: 6 Months
  • Scope: Excavation, foundation repair and replacement
  • Equipment Used: Excavators, compaction equipment, pump trucks, concrete trucks
Construction progress at Alfalfa Farms brewery build
Commercial Topsfield, MA Historic Site Brewery Build

Quick Facts

Historic Alfalfa Farms Site
Set to Open 2025
15 Yards of Concrete
10 Team Members

Services Provided

Excavation & Earthwork Concrete Pour Utility Cutouts Pin and Doweling

Key Achievements

  • Completed on Schedule
  • Zero Safety Incidents
  • Historic Site Preservation
  • Environmental Compliance
Planning
Preparation
Execution
Completion
6 Month Duration
15 Yards of Concrete
10 Team Members
0 Safety Incidents

Project Overview

This comprehensive commercial project reimagines the historic Alfalfa Farms property along the I-95 North corridor. The new brewery and winery destination demanded precise excavation, foundation rehabilitation, and coordinated utility trenching to prepare the site for its 2025 grand opening. Visitors will soon be able to explore the iconic silos while enjoying the expanded amenities that this build delivers.

Engineering

Careful engineering ensured every new structure met safety standards while integrating with existing historic elements.

Safety Excellence

Zero safety incidents throughout the build thanks to daily briefings, strict protocols, and experienced crews.

Environmental Protection

Implemented controls to protect adjacent structures and minimize community impact during construction.

Engineering & Infrastructure

The Alfalfa Farms site required thoughtful planning to marry modern brewery infrastructure with the property's historic character. Our team stabilized existing foundations, installed new utility corridors, and poured precision concrete slabs that support production equipment and guest amenities.

Safety Excellence

Comprehensive safety plans guided every stage of the project. Toolbox talks, protective systems, and on-site supervision delivered a flawless safety record while keeping the schedule on track.

Environmental Protection

Strict erosion control measures, material staging plans, and equipment maintenance protocols minimized environmental impacts and preserved the character of the surrounding community.

Challenges & Solutions

Working within active zoning requirements and existing farm structures required adaptability. Our team navigated complex permitting, coordinated multiple trades, and protected historic assets through strategic staging and phased execution.

  • Careful planning that aligned project milestones with regulatory checkpoints
  • Leveraged highly skilled labor to execute specialized foundation repairs
  • Maintained clear communication with town officials and stakeholders

Results

The Alfalfa Farms brewery build was delivered on schedule and within budget. With zero safety incidents and environmentally responsible practices, the project positions the property for decades of enjoyment by residents and visitors alike.